article thumbnail

LEAN Asset Life-cycle Management – Achieve Optimal Construction Outcomes

Job Order Contracting

Optimal construction outcomes such as 90%+ of project on-time and on-budget and 96% satisfaction levels are achieved daily, however, by less than 5% of all real property owners, contractors, architects and engineers. of all construction projects are actually delivered on-time and on budget. The net result is 2.5%

article thumbnail

Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

Consistent delivery of quality repair, renovation, maintenance, and new build projects on time and on budget is possible using an integrated planning, procurement, and project delivery solution. Budget and Schedule. Engineering, Construction and Architectural Management, 26(1), 104–. Management in Engineering, 35(1), 05018014.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

Best Value Facilities Repair, Renovation Work Order Delivery

Job Order Contracting

An integrated planning, procurement, and project delivery solution that drives consistent on-time, on-budget, quality outcomes at a fair price. All parties can visualize project and work order requirements at a granular level and drive efficient life-cycle management. Collaborative design for constructibility.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. A CRITICAL REVIEW OF VALUE MANAGEMENT AND WHOLE LIFE COSTING ON CONSTRUCTION PROJECTS.

article thumbnail

Construction Procurement Costs

Job Order Contracting

80%-90% of all construction projects are over-budget, late, poor quality, or result in one or more parties being dissatisfied. In the facilities management, architecture, engineering, construction sector, it is a way of life. In any other sector, this level of performance would be considered unacceptable.

article thumbnail

Collaboration in Construction Matters

Job Order Contracting

When properly implemented and supported, LEAN collaborative construction delivery consistently delivers 90% + of building repair, renovation, and new construction on-time, on-budget, and to everyone’s satisfaction. Are you interested in improving your life-cycle facilities management outcomes? contact-form].