Remove 2002 Remove Architecture Remove Schedule
article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

The real area of befuddlement is why real property owners have not changed the decades old legacy of rampant economic and environmental waste plaguing the AECCO sector (AECOO – Architecture, Engineering, Construction, Owner, Operator). Project management: a systems approach to planning, scheduling, and controlling.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Shorter construction schedules than planned. Engineering, Construction and Architectural Management, 19(4), 342-368. Engineering, Construction and Architectural Management, 18(5), 444-461. 2004; Black et al., 2000; Grajek et al., 2000; Gransberg et al., Lower project related cost growth. Fewer disputes and claims. Edelman, L.,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
article thumbnail

Revit OpEd: Panel Schedule and Load Calculation Addition

Revit OpEd

Panel Schedule and Load Calculation Addition. Book - Introducing Revit Architecture. Introducing Autodesk Revit Architecture 2012 Now Shipping. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. Panel Schedule and Load Calculation Addition.

Revit 53
article thumbnail

Efficient Construction Project Delivery for Public Sector Facility Owners – Renovation, Repair, Sustainability

Building Information Management

Though leverage facility best management practices such as job order contracting and supporting technologies is currently limited to a small percentage of the AECOO sector (Architecture, engineering, Construction, Operations, Owner), the benefits are both real and necessary in order to support economic and environmental viability. 5, 359-366.

article thumbnail

Efficient Construction Project Delivery for Public Sector Facility Owners – Renovation, Repair, Sustainability

Building Information Management

Though leverage of facility LEAN best management practices such as job order contracting and supporting technologies is now limited to a small percentage of the AECOO sector (Architecture, engineering, Construction, Operations, Owner), the benefits to all stakeholders are real. The establishment and/or transparency of cost. 1) Aller, G.

article thumbnail

Revit OpEd: Shared Parameters aka Dictionary

Revit OpEd

It can be seen from within a project but not scheduled or tagged unless it is a built in parameter like those listed under the Identity group (and provided for us by Autodesk). Consider that a Project Parameter is part of a project and applied to categories of families so that it can be scheduled, but NOT tagged. at 8:00 AM.

Revit 56