Remove 2002 Remove Consulting Remove Design
article thumbnail

Why Projects Fail

Job Order Contracting

The latter includes all internal personnel and departments as well as all external services providers (architects, engineers, contractors, consultants, etc.). 4) Client Consultation-Communication, consultation, and active listening to all impacted parties. Senior management failure is the #1 cause of poor project outcomes.

article thumbnail

Modular Can Be High End

Pro Builder

Joseph Tanney, a founder of Resolution 4 Architecture in New York City, who has been designing modular homes since 2002, said today’s modular homes can be very high end. Ty Sharp, a 26-year-old software consultant from Aspen, Colo., A seven-bedroom, nine-bathroom modular home that Mr. Tanney designed in Bridgehampton, N.Y.,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Building Design Suite Installation Readme

Revit OpEd

Building Design Suite Installation Readme. If you are preparing for installing the 2013 Revit products via the Building Design Suites then you might want to start with the System Requirements PDF documents for each version. Building Design Suite Installation Readme. Ive been a freelance Revit consultant since 2005.

Revit 53
article thumbnail

LEAN Job Order Contracting Intro 4

Job Order Contracting

Integrating operating, design and construction knowledge through broad based team meetings. Owner leadership without excessive reliance upon “JOC consultants” Focus upon best value outcomes. Construction Cost Workbook – 2002 – Conference on the International Comparison Program World Bank.

Contract 100
article thumbnail

Revit OpEd: BIM Coordinator for Civil 3D and Revit

Revit OpEd

Autodesk Labs posted an application that was developed by Autodesk Consulting. Note that it uses a file formatted as ACCSXML (Autodesk Consulting Coordinate System eXtensible Markup Language). Building Design Suite Installation Readme. Ive been a freelance Revit consultant since 2005. Thursday, May 10, 2012. ► 2011.

Revit 80
article thumbnail

Preliminary selection of exterior waterproofing systems 2021

Construction Specifier

To address this concern in 2002, the technical committee of the Los Angeles Chapter of the Construction Specifications Institute (LA-CSI) developed a guide to ‘Preliminary Selection of Waterproofing Systems.’. Our goal was to help the design team make better waterproofing decisions more efficiently,” said Roger A.

article thumbnail

Revit OpEd: Revit LT

Revit OpEd

Chief among the features that are missing are worksets, design options, rendering (only through Autodesk 360), no export to IFC, conceptual massing, interference checking, and parts or assemblies. Edit 9/6/2012: I received an email from Autodesk regarding Design Options. I see this as being great for consultants. Anonymous said.

Revit 74