Remove 2002 Remove Documentation Remove Schedule
article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

Contruction failure factors are have been fully documented. Project management: a systems approach to planning, scheduling, and controlling. Recognizing these causal factors and implementing available solutions can substantially reduce the number of failed projects, and more efficiently achieve other project objectives.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., Shorter construction schedules than planned. 2004; Black et al., 2000; Grajek et al., 2000; Gransberg et al., Lower project related cost growth. Edelman, L.,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEAN OpenJOC(TM) Job Order Contracting for Sustainable Facilities Repair, Renovation, and Minor New Construction

Job Order Contracting

The primary advantage of JOC has historically been is the flexibility permitted in ordered quantities and delivery scheduling. A public agency can place orders with one or more contractors when the actual need appears and received on-demand services from a vetted service provider. Flexibility in quantity and delivery scheduling.

Contract 100
article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.

article thumbnail

Increasing transparency for Copenhagen Metro with Autodesk’s Construction Cloud

Autodesk Construction Cloud

Since opening in 2002, over 1 billion passengers have travelled in the city by Metro. . And since its opening in 2002, the metro has been expanding. We are unable to collaborate on shared documents with internal and external project team members which means we spend a lot of time working in 2D,” says Joe.

Metro 98
article thumbnail

Reverse Callback Templating - Perl.com

Construction Dive

Design changes and code changes will not always share the same schedule because they belong to different domains. Documentation. December 2002 (5). November 2002 (9). October 2002 (7). September 2002 (11). August 2002 (8). July 2002 (8). June 2002 (4). May 2002 (6). Perl Bloggers.

article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

They were however using them for the room finish schedules. Area plans could help document such things but then floor plans would be "ignorant" of what these kinds of "areas" are, no tagging possible, just "dumb text". They are documenting what is dedicated to what and identifying them using the feature as intended by the developers.

Revit 76