Remove 2002 Remove Drawings Remove Office
article thumbnail

Why Projects Fail

Job Order Contracting

Capterra) 54% of of PM software being used is not cloud-based (Capterra) 41% of organizations with an enterprise-wide project management office report that it is highly aligned to the organization’s strategy. ( PMI ) 68% – more than 2/3rd – of organizations outsourced or contract project managers in 2018. ( and Turner, J.

article thumbnail

How Pre Engineered Building Is Better Than Conventional Building | Advantages & Disadvantages of Pre Engineered Buildings | Use of Pre Structure

CivilJungle

As per IS 1893 2002 (Part 1) , 7(DL ± LL), 7(DL ± EL) , and 3(DL + LL ± EL). Difference Between Sketching and Drawing | What Are Conceptual Sketches | Architecture Concept Drawing | Types of Drawings for Building Design. Applications of Pre Engineered Buildings. Image credit: www.droitsteelbuildings.com. Warehouses.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Revit LT

Revit OpEd

I worked for a firm years ago that this product could work for, a small office where each person did their own work for the principal. It's not uncommon for those type of consultants to have one person doing the drawings. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002.

Revit 74
article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

So if the archies made a simple Option Set with Two Options (Boundaries Exist, Boundaries dont), and they set "dont" to primary, but then set all of their drawings to secondary, everyone is happy. The arch model may have a single large Open Office room. Except the archies who whine about design options. :). Joe Carey said.

Revit 76
article thumbnail

Revit OpEd: Content or Content

Revit OpEd

So, as I am talking with Revit users in the office they all say "When do we ever design a window with equally spaced mullions?" Our office standard has a fairly large number of door types, and we have a separate family set up for each type. Also, we are usually on a time and money budget, so we must be quick about it.

Revit 56
article thumbnail

Cover Story: Global Biotech Report

Buisness Facilities Contributed Content

Due to the close proximity of the research centers and universities, the city is able to draw on a large talent pool. The incubator will have the capacity to host 500 to 700 researchers and it will offer around 10,000 square meters of laboratory space and 7,800 square meters of office space.

Georgia 68
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings. As Chief Operating Officer, David is responsible for developing EastCoast’s overall Product and Business Strategies.

BIM 45