Remove 2004 Remove Documentation Remove Site
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

Taipei 101 received the Emporis Skyscraper Award in 2004. They were the world’s tallest buildings from 1998 to 2004 if measured from the level of the main entrance to the structural top, the original height reference used by the US-based Council on Tall Buildings and Urban Habitat from 1969.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How to Implement Construction Software in Your Business

Lets Build

In 2004 Loughborough University conducted a study entitled Technology Implementation Strategies for Construction Organisations. Construction software is a long-term investment for your business since it will increase efficiency on site and allow for better management of the whole project. Nevertheless, this is a big misunderstanding.

Software 164
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., 2004; Black et al., Characteristics of Strategic Collaboration and Efficient Construction Project Delivery. 2000; Grajek et al., 2000; Gransberg et al.,

article thumbnail

Scope Boxes

Revit OpEd

I wrote the following documents in 2004 while I worked for Wimberly Allison Tong & Goo (WATG). Ironically I didn't focus on that in this document, I guess I took that bit for granted. There is a sample project file on my site. Below this first embedded document is another that is a guide to experimenting with the file.

article thumbnail

Revit OpEd: Egress Path Options

Revit OpEd

In 2006 I demonstrated (at Autodesk University) the then new line based family type by explaining how we could use it to document egress path requirements also known as exiting plans. Defining the requirements for documenting exiting are naturally going to affect the success of any solution we try to provide. Site Information.

Revit 81
article thumbnail

Revit OpEd: In-Place Massing and Project Orientation Inequity

Revit OpEd

Ive always stressed that people should start a project without being concerned about site alignment immediately. In this image the massing has been created aligned with the "site" but weve realized that it would be easier to document if Project North were aligned along one building edge. Site Information. Egress Paths.

Revit 60