Remove 2004 Remove Drawings Remove Software
article thumbnail

Sight Survey 2016 – A Completely 3d Coordinate Geometry Package For Surveyors

Construction Cost Estimating

Carlson Software recently launched Sight Survey 2016 , a completely 3d coordinate geometry package that includes a wide range of toolset to bring solutions to your regular COGO calculations. Sight Survey 2016 contains supplementary tools which can work with Carlson’s 3D design environment software in Precision 3D – Culverts (sold distinctly).

CAD 40
article thumbnail

A Giant That Is (Still) Creeping Through the Construction Industry: Digitization

Building Radar

For example, for automated construction planning, an automated comparison of similar projects can lead to software-generated recommendations for decisions in the current construction process. Many offices still shy away from the high costs of BIM software. Back then, a robot arm applied layers of concrete instead of plastic.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Projects Fail

Job Order Contracting

56% of trade contractors cite poor coordination and communication as negative impact on productivity 68% of trade contractors claim that poor schedule management is the top contributor to low productivity Only 22% of organizations use a PM software. VersionOne ) 77% of high-performing projects use project management software.

article thumbnail

Revit OpEd: Family Types Dialog - Lock Parameter

Revit OpEd

To lock a dimension directly in the drawing area, click next to the dimension.". This means that as the dimensions are moved in the drawing area, the associated parameters are constrained and the dimension value is preserved.". Note: Locked dimensions and their associated parameters cannot be changed in the drawing area.

Revit 66
article thumbnail

Revit OpEd: YUZU Site Measuring

Revit OpEd

The software boils down to these concepts: Defining Levels and Lease holders and then using 5 different tools to deal with measurements: Distance, Ortho, Offset, Rectangle and Triangle. They claim that with these features you will be able to create any drawing, shape and size of buildings. Content and Software Developers.

Revit 74
article thumbnail

20 construction industry trends to watch in 2020

Building Radar

Project management software: smart tools for fast teams 4. Forecasts: How the construction industry in Germany will develop in 2020 Software in the construction industry 1. CRM software is designed to increase sales and retain customers, while ERP systems are designed to reduce costs. IoT: building with wireless intelligence 5.

article thumbnail

Isn’t someone missing here? (What is my problem with Autodesk?)

DebunkTheBIM

In the end, they are ‘just’ a software provider, successful at what they are doing, why can’t I just let them be. I had my first training in Revit in 2004 and get around it OK. My biggest problem is not that Revit is a ‘dog of a software’. Autodesk has sewn up the HK market. The global AEC too. What is my problem with Autodesk?