Remove 2004 Remove Equipment Remove Schedule
article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

4 Failure to leverage granular construction-based line of granular tasks and associated labor, material, equipment, and productivity information Inconsistency in planning and scope management, poor communication, and failure to address stakeholder engagement can be rectified. References: Atkinson, R. Construction project management.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Locally researched labor, material, equipment, and productivity data is essential in the devlopement of a credible construction cost estimate. ENR economic index, etc.) applied to a outdated cost estimate will introduce significant error. 3# Local Market – All cost data must be based upon local market conditions.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

Taipei 101 received the Emporis Skyscraper Award in 2004. They were the world’s tallest buildings from 1998 to 2004 if measured from the level of the main entrance to the structural top, the original height reference used by the US-based Council on Tall Buildings and Urban Habitat from 1969. Related posts: civil engineering?

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

Kitchen Equipment - RW Smith BIM Booklet. 1 comment: Suppliers of Catering Equipment. Delete Sheets In Browser or Schedules. Kitchen Equipment - RW Smith BIM Booklet. ► 2004. (2). ► December 2004. (1). ► November 2004. (1). ► 2004. (2). ► December 2004. (1).

Revit 71
article thumbnail

Schedule LOD’s – Levels of Detail for Construction Schedules

Building Information Management

Jelen’s Schedule Levels. Functionally there is very little practical application for a schedule that is only a single bar other than to represent an element of a project or program time line. Level zero schedules normally will include the project or program major milestones and bars indicating key scope. Schedule Level.

article thumbnail

EARTHQUAKE MAGNITUDE AND ENERGEY RELEASED

The Constructor

times On 26 December 2004, an earthquake of magnitude 9.0 releases 1000 times more energy than the earthquake of magnitude of 6.2 and 32 times more than the magnitude of 7.2. A table below gives the relation between magnitude change and energy released during earthquake. Magnitude change Energy released 2.0 1000 times 1.0 32 times 0.5

Concrete 162