Remove 2004 Remove Equipment Remove Sewer
article thumbnail

SPECIAL REPORT: Site Location Factors For Automotive Suppliers

Buisness Facilities Contributed Content

Automotive Original Equipment Manufacturer (OEM) production increases and the prospect of further establishment of new OEM facilities in already supplier rich geographic corridors are expected to drive significant expansions and green field locations for OEM suppliers. Figure 2 : Vehicles Sold, 2004 — March 2013. 4) Labor Draw.

Site 60
article thumbnail

Automotive Industry Focus: Hitting On All Cylinders

Buisness Facilities Contributed Content

From a move to lighter-weight vehicles to upgraded state-of-the-art equipment to the production startup of one of the world’s most popular luxury vehicles, Kentucky continued to make a major impact on the auto industry throughout 2015. The Titan has been in production since 2004 and is assembled exclusively at the Canton facility.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Contractors Should Consider Hiring Us Over A Bookkeeper

Contractor Bookkeeping

No networking equipment, hardware, software, expensive updates and tech support. No additional utility costs for heat, ventilation, air conditioning, lights, water, sewer and garbage. No having to deal with the entire unemployment issue and possible wrongful termination lawsuit.

US 49
article thumbnail

Maryland Bans Polystyrene and Enacts 31 other New Environmental Laws

Green Building Law Update

Maryland’s Renewable Portfolio Standard was enacted in 2004 to facilitate a transition to renewable sources of energy. Water and Sewer Services. Between October 1, 2018, and January 31, 2019, there were 342 reports of incidents of sewer overflows or treatment bypasses (an average of 21 per week). Clean Energy Jobs.

Maryland 120
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. Process Equipment Subgroup: Divisions 40 – 49. 1995 Edition.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. Process Equipment Subgroup: Divisions 40 – 49. 1995 Edition.