Remove 2004 Remove Management Remove Modeling
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

2004; Black et al., management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. International Journal of Project Management, 25(4), 386-393. Conceptual model of partnering and alliancing. Management Institute.

article thumbnail

Behind the Build: Interview with Mostafa Saber, BIM & Design Manager at Diamond Developers

Autodesk Construction Cloud

We sat down with Mostafa Saber , BIM & Design Manager at Diamond Developers as he walked us through his career journey, the challenges he faces while modernising and his vision for the future of construction. I started my career as an architect in my home city, Cairo, Egypt in 2004. Check out our conversation below!

BIM 119
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Lean methodology is ignored by the construction sector

Job Order Contracting

Research has readily noted the causal factors for the relative lack of adoption of Lean across the construction and facilities management sectors. Journal of Civil Engineering and Management, 14(2), 73–78. Development of a conceptual model of construction partnering. Retrieved July 12, 2010, from [link] Alinaitwe, H. 1440-7027).

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Education, key performance indicators, common terms and definitions, collaborative construction delivery methods, and current, objective, local market granular cost data as well as supporting technology can to be leveraged to enable significant cost savings via signifincant improvements in cost visibility, cost management, and productivity.

article thumbnail

Why Projects Fail

Job Order Contracting

First and foremost is important to understand that all projects are exercises in managing change. The key to consistent delivery of successful projects therefore lies in the ability to account for and/or manage variations as they occur. As people naturally resist change, it is up to leadership to embrace and support change management.

article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. When we have architecture and structure in separate Revit models we end up with somewhat clumsy graphics in wall sections. This is more pronounced if the structural slab is in the structure model only. It's a little easier to manage than reveals. ► 2004. (2).

Revit 53
article thumbnail

Public Sector Real Property Management – Quality Construction Cost Estimating – Earned Value Management

Building Information Management

However, multiple studies/reports note that available and proven LEAN best management practices have not been implemented on a widespread basis.