Remove 2004 Remove Schedule Remove Site
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

For example, GAO and other studies/reports consistently report that errors and lack of due diligence with respect to original construction cost estimates are primary reasons for negative cost and schedule impacts, and overall poor project performance and outcomes. T The following figure, for example, was produced in 1972.

article thumbnail

Schedule LOD’s – Levels of Detail for Construction Schedules

Building Information Management

Jelen’s Schedule Levels. Functionally there is very little practical application for a schedule that is only a single bar other than to represent an element of a project or program time line. Level zero schedules normally will include the project or program major milestones and bars indicating key scope. Schedule Level.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
article thumbnail

Revit OpEd: YUZU Site Measuring

Revit OpEd

YUZU Site Measuring. For readers that are already familiar with the Point Known PKNail site measuring system it appears to be similar, at least in concept. I think attempting to evaluate this type of technology would benefit from a few videos that show it in use, the practical application of it on-site. Site Information.

Revit 74
article thumbnail

Revit OpEd: Panel Schedule and Load Calculation Addition

Revit OpEd

Panel Schedule and Load Calculation Addition. Site Information. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. Refer to Autodesks own web site and product pages for specific trademark and copyright information. YUZU Site Measuring.

Revit 53
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

2004; Black et al., Shorter construction schedules than planned. The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., 2000; Grajek et al., 2000; Gransberg et al., Lower project related cost growth. Bayliss, R.,

article thumbnail

SEO and PPC Best Practices Webcast

Construction Marketing

The free webcast for members and non-members is scheduled for Thursday, November 17, 2011 at 1 pm CST. The site links to the award-winning Construction Marketing Blog with marketing news, resources and related content, and the association’s Twitter , Facebook , YouTube and LinkedIn pages.

Illinois 237