Remove 2007 Remove Architecture Remove Schedule
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Shorter construction schedules than planned. Engineering, Construction and Architectural Management, 19(4), 342-368. The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., 2004; Black et al., 2000; Grajek et al.,

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Panel Schedule and Load Calculation Addition

Revit OpEd

Panel Schedule and Load Calculation Addition. Book - Introducing Revit Architecture. Introducing Autodesk Revit Architecture 2012 Now Shipping. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. Panel Schedule and Load Calculation Addition.

Revit 53
article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

Until 2007 it was the tallest building in the PRC, the fifth tallest in the world by roof height and the seventh tallest by pinnacle height. Its height was surpassed on September 14, 2007 by the Shanghai World Financial Center. It contains offices and the Shanghai Grand Hyatt hotel. Related posts: civil engineering?

article thumbnail

PSMJ Resources Blog: Do Small Projects Need Schedules?

PSMJ Resources

Do Small Projects Need Schedules? Is it really critical that small projects have a schedule? Here are some of the most important reasons that schedules are developed: 1) First and foremost, you always want to get the work done on time. Without a schedule, it gets done when it gets done. Architectural Record.

article thumbnail

Revit OpEd: 2012 Central States Revit Workshop - Omaha, Nebraska

Revit OpEd

This is the schedule/agenda for the two day Revitganza. Book - Introducing Revit Architecture. Introducing Autodesk Revit Architecture 2012 Now Shipping. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. ► 2007. (77). Revit OpEd.

Omaha 80
article thumbnail

Revit OpEd: Happy Birthday Revit

Revit OpEd

Book - Introducing Revit Architecture. Introducing Autodesk Revit Architecture 2012 Now Shipping. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. Delete Sheets In Browser or Schedules. ► 2007. (77). ► December 2007. (1).

Revit 82