Remove 2009 Remove Software Remove Zoning
article thumbnail

Construction Business Owner Blogs

Construction Business Owner

SOFTWARE |. Software & Technology. Recently I had a friend fall walking near a construction zone while carrying a case of water to her coffee shop. She tripped over one of the construction sign legs that was sticking out beyond the construction cone and fencing, but she was not walking in the construction zone.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

SOFTWARE |. Software & Technology. Form, Function and Construction Software » Safety is More than a Mission Statement. The more complex answer is workers are being pushed and pressured on production to the point that workers get into a zone of “get it done regardless of safety.” December 2009. November 2009.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

The essence of my response via email: HVAC Zones are meant to combine spaces into larger more coherent collections for engineering purposes. I have recently had to use room separation lines as the only way to create rudimentary FM schedules to allocate users and equipment to a desk/zone. Aaron Maller. Thanks for the comments all!

Revit 76
article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

Traditionally known as the “Creative Capital of the South,” Baton Rouge has established itself as a thriving high-tech hub for IT/software development and digital media while continuing to be an attractive location for corporate headquarters, relocations and traditional manufacturing. The new tech center will provide IBM’s clients in the U.S.

Metro 111
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

In March, IBM announced a new 800-job technology center in downtown Baton Rouge that will provide software development and software maintenance services to clients in the U.S. with services that address the increasing demand for flexible software to keep up with Big Data, cloud and mobile requirements they are facing.

Metro 110
article thumbnail

Cover Story: 2014 Business Facilities Rankings Report

Business Facilities

Name a growth sector—digital media, advanced manufacturing, IT/software—and Louisiana has a specific program geared to welcome new players, with a proven track record of successful startups. Gary Herbert took office in 2009 (replacing Jon Huntsman, who was named U.S. In January, Texas completed the last segment of the $6.8-billion

Louisiana 111
article thumbnail

Current and Future Use of BIM – 2013 – UK

Building Information Management

A designer’s primary interest is for example the spatial structure, a structural engineer’s primary interest is the load bearing structure, while an energy engineer is interested in climate zones. QTO, and an exclusively enhanced 400,000 line itme RSMeans Cost database.

BIM 65