Remove 2011 Remove BIM Remove Schedule
article thumbnail

DebunkTheBIM: Model validation through scheduling

DebunkTheBIM

I consider myself to be a model-based construction information practitioner (shortened to a ‘BIM- meddler’) rather than an ‘expert’ or even ‘specialist’ Wednesday, November 16, 2011. Model validation through scheduling. ▼ 2011. ► September. (4). ► August. (3).

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

The Business of Construction Risk Management » The Fundamentals of Building Information Modeling (BIM). Building Information Modeling (BIM) is no different. Before jumping into BIM with both feet, let’s work on some fundamentals. BIM changes that and even more. BIM is also a process. Home » Blogs.

article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

Kitchen Equipment - RW Smith BIM Booklet. The company recently finished up their BIM Services booklet hosted by Issuu. Labels: BIM , content , Contractor , Plugs , Vendor. Blog Listing - BIM and Misc. Delete Sheets In Browser or Schedules. Kitchen Equipment - RW Smith BIM Booklet. ► 2011.

Revit 71
article thumbnail

CAD Shack: AUGIWorld August 2011 Issue Released!

CAD Shack

Wednesday, August 24, 2011. AUGIWorld August 2011 Issue Released! I am the BIM Manager for Alvine Engineering, a college instructor and the Revit MEP Content Manager for AUGIWorld Magazine. IFC-BIM Exchange Forum. Revit MEP How to Create a Lighting Fixture Schedule. BIM Board of Omaha. BIM Manager.

CAD 40
article thumbnail

Five Causes of Construction Rework and How to Avoid Them

Fieldwire

It typically means some portion of work has to be redone to fix a problem, often with adverse schedule and cost impacts. According to research published by the Construction Industry Institute (CII) in 2011, rework costs can range from 2 to 20 percent of a typical project’s contract value. Planning and Scheduling Problems.

article thumbnail

Revit OpEd: Panel Schedule and Load Calculation Addition

Revit OpEd

Panel Schedule and Load Calculation Addition. A thread at AUGI that started in December 2011 described a situation that Panel Reports show some connected loads as "0". Blog Listing - BIM and Misc. Panel Schedule and Load Calculation Addition. ► 2011. ► December 2011. (19). ► October 2011.

Revit 53