Remove 2011 Remove Management Remove Modeling Remove Schedule
article thumbnail

The True Value of 3D Modeling for Home Builders

Pro Builder

The True Value of 3D Modeling for Home Builders. More than a marketing tool, 3D modeling can save time and money by providing greater accuracy. For an increasing number of them, this transition entails moving from two-dimensional (2D) drawings to three-dimensional (3D) digital modeling. The Path to 3D Modeling.

Modeling 105
article thumbnail

DebunkTheBIM: Model validation through scheduling

DebunkTheBIM

I am a manager of construction information, tools and people. I consider myself to be a model-based construction information practitioner (shortened to a ‘BIM- meddler’) rather than an ‘expert’ or even ‘specialist’ Wednesday, November 16, 2011. Model validation through scheduling.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Shorter construction schedules than planned. management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. International Journal of Project Management, 25(4), 386-393. Conceptual model of partnering and alliancing. Akintoye, A.,

article thumbnail

Behind the Build: Interview with Chris Walker, VDC Project Manager at PENTA Building Group

Autodesk Construction Cloud

Chris Walker, VDC Project Manager at The PENTA Building Group, exemplifies this trait incredibly well. As for me, I’m in the VDC department, specializing in construction management, BIM, and construction technology. Walk us through your career and what led you to become VDC Project Manager.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Rooms and areas can be deleted in model views like floor plans and ceiling plans. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. Whadya think?

Revit 56
article thumbnail

Five Causes of Construction Rework and How to Avoid Them

Fieldwire

It typically means some portion of work has to be redone to fix a problem, often with adverse schedule and cost impacts. According to research published by the Construction Industry Institute (CII) in 2011, rework costs can range from 2 to 20 percent of a typical project’s contract value. Planning and Scheduling Problems.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

MANAGEMENT |. General Management. People Management. Equipment Management. The Business of Construction Risk Management » The Fundamentals of Building Information Modeling (BIM). Building Information Modeling (BIM) is no different. Modeling & Design. STRATEGY |. ACCOUNTING |.