Remove 2012 Remove Airports Remove Estimating
article thumbnail

Building Hong Kong's Airport

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 km² platform.

Airports 203
article thumbnail

Subways in America

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. RECOMMENDED FOR YOU Building Hong Kong’s Airport Close All rights reserved.

America 203
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Organizing projects means defining roles and responsibilities, create a project charter, and develop high-level time and cost estimates.

article thumbnail

TYPES OF PRECAST COMPONENTS IN A BUILDING

The Constructor

Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Reply Alaa Ragab Posted on 18/04/2012 at 06:37 thanks for your efforts. All rights reserved. RECOMMENDED FOR YOU PERMANENT FORMWORK METHOD FOR BEAM CONSTRUCTION Close

Concrete 240
article thumbnail

FEATURES OF PRECAST CONCRETE

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Posted in Category: Concrete Technology , Precast Concrete 4 Comments Ramesh Joshi Posted on 25/08/2012 at 20:02 what are disadvantages of precast concrete? Thanks for your openion.

Concrete 229
article thumbnail

WHY WE TEST CONCRETE SRTRENGTH AFTER 28 DAYS?

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Reply Pak Nixk Posted on 29/03/2012 at 04:36 bagus…utk infomasi kita semua. Reply Hemen Thakuria Posted on 06/04/2012 at 09:45 what if the cube set failed in test?

Concrete 250
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Here the data is fed into the agency’s database such that it can gain an overall picture of the state of the bridge and calculate an estimate of likely future expenditure.