Remove 2016 Remove Commissioning Remove Leases
article thumbnail

Nevada Stops Subsidizing Net Metering

Green Building Law Update

In the final days of 2015, Nevada became the front line in the looming nationwide fight over energy policy when the Public Utilities Commission of Nevada altered rates for net metering impacting homeowners with rooftop photovoltaic panels. It is not good energy policy. It is not good environmental policy.

Nevada 120
article thumbnail

LEED Commercial Interiors can Save the Planet

Green Building Law Update

And for projects registered since October 31, 2016 that means the LEED v4 ID+C: CI rating system. The CI v4 EAc1: Enhanced Commissioning credit goes farther than the fundamental commissioning incorporating changes from the v4 prerequisite that make this credit more advantageous and less first dollar cost intensive than in v 2009.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Green Building Data Risk as an Opportunity

Green Building Law Update

The European Union has gone in another direction with the 2016 General Data Protection Regulation , applicable as of May 2018, updating and modernizing the principles enshrined in the 1995 Data Protection Directive which guarantee individual privacy rights in one’s personal data including “the right to be forgotten.”

Green 120
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning.

Green 156
article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning.

Green 136
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. As part of the More Alaska Production Act passed in 2013, for the North Slope only, this credit will increase to 45% on January 1, 2014, and the credit will change to 35% beginning January 1, 2016.

Income 108
article thumbnail

North Dakota Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

State Water Commission funds, not exceeding $20,000 per borrower, may be used to supplement Ag PACE funds for the purchase of irrigation equipment on new irrigated acreage. Loan funds may be used to finance real estate, machinery and equipment and for the purchase or leasing of equipment.