Remove Aconex Remove Drawings Remove Industrial
article thumbnail

DebunkTheBIM: Reconstructing drawing-sets and the case of the.

DebunkTheBIM

I believe that hands-on manipulating of project information by all project participants is the key to achieving any meaningful improvement of the AEC industry operating within the post-gambling-era. Reconstructing drawing-sets and the case of the Great Pretenders. Reconstructing drawing-sets and the case of the 'G.

article thumbnail

The Future Of Construction – BIM

Lets Build

CAD drawings are used during Level 0, but there is no sharing of the generated information models. The industry has already surpassed this step and is heading to a more collaborative way of producing and distributing the necessary information. Softwares like Aconex or Viewpoint can be used as the CDE. What The Future Brings.

BIM 168
article thumbnail

Don’t shoot for Paperless – Go Drawingless!

DebunkTheBIM

It is the ‘drawing based’ approach that is causing us trouble. Drawing based is centred on the ‘projection technique’ (i.e. orthogonal projection – what 2D technical drawings are ‘made’ from) a risky solution that requires high level of skills from the operators. Drawing based is centred on the ‘projection technique’ (i.e.

Aconex 48