Remove Agreement Remove Commercial Remove EJCDC
article thumbnail

Specifications for design-build projects

Construction Specifier

Thus, whether it is the master specifications of an architecture or engineering firm or project owner, SpecsIntact (an automated master specifications system used by several government agencies), or commercial master guide specifications, chances are the available source documents were written for DBB projects.

EJCDC 52
article thumbnail

#111:  The "One Year" Warranty: Myth and Reality

NH Construction Law

A common misperception among commercial contractors, particularly those who use standard form contracts, is that their warranty obligations only last for a year. of ConsensusDocs 200 – Standard Agreement and General Conditions Between Owner and Constructor. The basic one is found in Section 3.5.1,