Remove Agreement Remove Life Cycle Remove Software Remove Visualization
article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

I also oversee the development life cycle, starting with due diligence, all the way up through the end of construction and through the warranty period. When you're inputting cost data, plan data, or change data into the system, it lets you visualize where the project is at any given point. That's six different agreements.

Design 80
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. has 18 years of international business management experience, of which 10 years were dedicated to the construction software industry. 10:00 – 11:30 AM Construction – Fabrication Integration.

BIM 45
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. has 18 years of international business management experience, of which 10 years were dedicated to the construction software industry. 10:00 – 11:30 AM Construction – Fabrication Integration.

BIM 40
article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

As such it serves as a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life cycle from inception onwards. The management of work processes and software tools to produce required project information. BIM Life-Cycle Views. See Project Delivery Method.

BIM 40
article thumbnail

Job Order Contract Cost Estimating

Job Order Contracting

GPS mapping/visualization. Support and training from a team that has decades of experience LEAN consturction delivery and life-cycle facilities / infrastructure asset management. Service Level Agreement. Report generation and export to Excel or Adobe PDF. Document version control. Document access control. contact-form].

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.