Remove Airports Remove Design Remove Risk Remove Schedule
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

For example, GAO and other studies/reports consistently report that errors and lack of due diligence with respect to original construction cost estimates are primary reasons for negative cost and schedule impacts, and overall poor project performance and outcomes. T The following figure, for example, was produced in 1972.

article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage RiskĀ 

Autodesk Construction Cloud

And with good reason: the right insights can improve everything from project cost and timeline accuracy to reducing the risk of lawsuits and disputes, and even winning more business. Or implementing new safety training to mitigate worker injury risk You can then use that knowledge to anticipate and better manage risk for future jobs.

Risk 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. These mixes of fixed cement-aggregate ratio which ensures adequate strength are termed nominal mixes.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 230
article thumbnail

Achieving project success through product and material testing

Construction Specifier

By Heather Stahl-Figueroa Designing and constructing a building is increasingly complex. These can be done at regular intervals, anytime from the beginning to completion, and will help avoid potential risks later. The technicians check for moisture and compaction, which will influence the structural design of foundations.

article thumbnail

Free Interior Design Softwares

The Constructor

All of these elements are used by interior designers to develop a functional, safe, and aesthetically pleasing space for a building’s user. The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics).

Software 115
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

In this phase you assemble your team and assign tasks to individuals, develop a budget for the project, develop a schedule and create a communications plan. Team members monitor and control progress in terms of cost, time, and quality; and manage risk.