Remove Airports Remove Documentation Remove Inspections
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. km² platform.

Airports 203
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT? All rights reserved.

America 203
article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Depending on how big or complicated the pour is, the inspection may just take few minutes or it could take hours. Only when the formwork has been approved, may the pour take place. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?

Concrete 235
article thumbnail

TYPES OF CRACKS IN CONCRETE BEAMS

The Constructor

Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?

Concrete 244
article thumbnail

REINFORCEMENT COVER AND PRE-CONCRETE CHECKS

The Constructor

The first part is a visual inspection by the clerk of works or equivalent. The required amount of cover will always be specified on the design drawings, but no time should the cover be less than the maximum size of aggregate plus 5mm.

Concrete 250
article thumbnail

TYPES OF CRACKS IN REINFORCED CONCRETE SLABS

The Constructor

Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?

Concrete 235