Remove Airports Remove Documentation Remove Reference
article thumbnail

STAAD PRO MANUELS & GUIDES

The Constructor

Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?

Concrete 153
article thumbnail

CONSTRUCTION SITE PLANNING

The Constructor

The opportunities and constraints inherent to a site and the response to a program/design brief are analysed and documented in an overall site planning document that should accompany a development application. Site planning in architecture and landscape architecture refers to the organizational stage of the landscape design process.

Site 178
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. These mixes are termed standard mixes. IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. 3) and (1:1:2) respectively.

Concrete 240
article thumbnail

Shoring, Underpinning and Scaffolding

The Constructor

The phrase can also be used as a noun to refer to the materials used in the process. concrete structures shoring, in this case also referred to as falsework, provides temporary support until the concrete becomes hard and achieves the desired strength to support loads. In this case, shoring should not be confused with shielding.

Concrete 203
article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

v) Vertical reference pillars are erected at a distance of 1 meter from the edges of excavation for vertical control of building during construction. 2) The axial lines (center lines) of the trenches are marked with the help of profiles, sighting rails, strings and pegs. (3)

article thumbnail

Construction of World Trade Centers

The Constructor

The site is currently being rebuilt with six new skyscrapers and a memorial to the casualties of the attacks. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?

Concrete 127
article thumbnail

constructionattorneyblog: Airport Design team sues Atlanta

Construction Lawyer

His book, Legal Guide to AIA Documents, published by Aspen Publishing, is in its fifth edition. All references to "Sabo & Zahn" refer to Sabo & Zahn LLC. Airport Design team sues Atlanta. Listed below are links to weblogs that reference Airport Design team sues Atlanta : Recent Posts. Copyright Notice.

Atlanta 40