Remove Airports Remove Inspections Remove Reference
article thumbnail

STAAD PRO MANUELS & GUIDES

The Constructor

Home News Videos Tips Building Building Bye Laws Building Materials Aggregates Cement Wood Building Tips Buildings Green Buildings Flooring Formwork/Shuttering Paints & Decoratives Skyscrappers Smart Materials Concrete Concrete Admixtures Concrete Cracks Crack Repair Concrete Durability Concrete Properties Concrete Types Fibre reinforced Fire Proof (..)

Concrete 153
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. These mixes are termed standard mixes. IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. 3) and (1:1:2) respectively.

Concrete 240
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

v) Vertical reference pillars are erected at a distance of 1 meter from the edges of excavation for vertical control of building during construction. 2) The axial lines (center lines) of the trenches are marked with the help of profiles, sighting rails, strings and pegs. (3)

article thumbnail

Shoring, Underpinning and Scaffolding

The Constructor

The phrase can also be used as a noun to refer to the materials used in the process. concrete structures shoring, in this case also referred to as falsework, provides temporary support until the concrete becomes hard and achieves the desired strength to support loads. In this case, shoring should not be confused with shielding.

Concrete 203
article thumbnail

What Are The Popular Heavy Equipment Used On Most Jobs

Construction Marketing

If the excavator is being used heavily, these parts, including other supporting parts, such as the bucket, attachments, and heavy equipment rubber tracks , should be inspected daily and immediately changed when already showing signs of wear. Excavators generally have two main parts: the boom and the cab.

Equipment 156
article thumbnail

Construction of World Trade Centers

The Constructor

The site is currently being rebuilt with six new skyscrapers and a memorial to the casualties of the attacks.

Concrete 127
article thumbnail

CONSTRUCTION SITE PLANNING

The Constructor

Site planning in architecture and landscape architecture refers to the organizational stage of the landscape design process. Site planning is the art of arranging structures on the land and shaping the spaces between, an art linked to architecture, engineering, landscape architecture, and city planning.

Site 178