article thumbnail

Achieving project success through product and material testing

Construction Specifier

The construction industry faces a myriad of challenges, such as completing projects on schedule, ensuring the quality and safety of products and materials, overseeing the costs so they do not exceed the budget, and complying with corporate environmental and social responsibility standards; all while applying effective risk management at every step.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. It is easily cut to shape on site, and if handled and stored carefully, it can be used many times. Note the different thickness: A standard plywood thickness on site is 18mm.

Materials 136
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Locally researched labor, material, equipment, and productivity data is essential in the devlopement of a credible construction cost estimate. ENR economic index, etc.) applied to a outdated cost estimate will introduce significant error. 3# Local Market – All cost data must be based upon local market conditions.

article thumbnail

The benefits of biophilic design in the built environment

BD+C

Airports K-12 Schools Hospital Design Trends Office Buildings Designers Architects Biophilic Design Biophilic design supports the health and wellbeing of individuals by connecting people to nature. In Los Angeles, our 13,482-sf office is LEED and Fitwel certified.

article thumbnail

[VIDEO] Watch 1400 Days of Work Building the NFL’s Largest Stadium in 3 Minutes

Construction Junkie

Thankfully, EarthCam has us covered on the full timelapse video, which you can watch below, of the 1400 day construction schedule that started in November of 2016. After the completion of construction, Sofi Stadium became the league’s largest stadium by square footage (3.1 million pound behemoth.

article thumbnail

Selecting a Job Order Contracting Cooperative

Job Order Contracting

Lowest possible implementation costs while maintaining value Faster completion times & flexible project scheduling Comprehensive LOCALLY RESEARCHED unit price books (UPB) including labor, material, equipment, and crew details, separate demolition line items, and individual line item modifiers.

Contract 100
article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Silver Line Metrorail project leading to the Dulles International Airport. Instead of the installed panels lasting for 100 years, water would be able to penetrate the concrete to deteriorate the materials at a faster rate. Providing complete descriptions of the misstep can prevent it from materializing again with another project.