Remove Airports Remove Plans Remove Railroad
article thumbnail

Iowa approves $3.4B infrastructure plan

Construction Dive

The transportation commission approved a 2019-2023 program that includes airport, transit, railroad, trail and highway projects.

Iowa 97
article thumbnail

Winners in the Next Economy

Buisness Facilities Contributed Content

The Aerotropolis Steering Committee has taken steps to set the city on a strategic path to redevelop the area around Memphis International Airport and other areas in the business community. The term Aerotropolis or “airport city” comes from Dr. John Kasarda who also spoke at the conference. Why start from scratch?”.

Memphis 80
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

World's Largest Ongoing Construction Projects

Construction Cost Estimating

Al Maktoum Airport, Dubai Different airports don't set you up for the size of Dubai's Al Maktoum International Airport, which reaches out over in excess of 21 square miles. The airport's subsequent development stage alone has an expected expense of more than $32 billion. The whole project is scheduled to be done in 2024.

article thumbnail

Construction of World Trade Centers

The Constructor

In gaining approval for the project, the Port Authority of New York and New Jersey agreed to take over the Hudson & Manhattan Railroad which became the Port Authority Trans-Hudson (PATH). The original World Trade Center was designed by Minoru Yamasaki in the early 1960s using a tube-frame structural design for the twin 110-story towers.

Concrete 127
article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

In comparison, railroads are in a much better position regarding infrastructure, equipment and personnel. Three Class I railroads (Norfolk Southern, Canadian Northern and the CSX) serve Decatur and are directly interconnected through a privately owned intermodal ramp as part of the Midwest Inland Port. Subsequently, the U.S.

article thumbnail

FEATURE STORY: Game-Changer In The Heartland

Buisness Facilities Contributed Content

Located on 250 acres of land at ADM’s Decatur processing complex, the new intermodal ramp offers direct access to three Class I railroads and close proximity to four interstate highways and a major U.S. According to the American Association of Railroads, U.S. Louis and Indianapolis. It offers highway entry to I-72, U.S. 36 and U.S.

article thumbnail

Celadon to Open Driver Training School in Indy, Add 500 New Jobs

Buisness Facilities Contributed Content

to announce the company’s plans to locate a driver training school here, creating up to 500 new jobs by 2022. Celadon plans to bring in overlapping classes of driver trainees every two weeks. up to $2,950,000 in conditional tax credits and up to $200,000 in training grants based on the company’s job creation plans. .”