Remove Airports Remove Plans Remove Roads
article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. km² platform.

Airports 203
article thumbnail

RESIDENTIAL BUILDING SITE PLANNING

The Constructor

Residential house site should be located away from the busy commercial roads. The requirements of site for buildings with different occupancies are different. So all the buildings proposed for different purposes have different requirements and thus different considerations for their site selection.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

CONSTRUCTION SITE PLANNING

The Constructor

The opportunities and constraints inherent to a site and the response to a program/design brief are analysed and documented in an overall site planning document that should accompany a development application. Good site planning therefore starts with a comprehensive analysis of the site, within the immediate and regional context.

Site 178
article thumbnail

4 key innovations and construction trends across airport design

BD+C

4 key innovations and construction trends across airport design 0 qpurcell Mon, 12/04/2023 - 10:04 Airports Here are some of the key trends Skanska is seeing in the aviation sector, from congestion solutions to sustainability. More than 40,000 airports worldwide facilitate the annual global travel of billions of passengers.

Airports 105
article thumbnail

Where is Most Construction Happening in the China: 2024 Overview

Building Radar

These initiatives are designed to ease congestion and promote sustainable urban living sustainable urban planning. High-Speed Rail Network Development China is continuing its aggressive expansion of its high-speed rail network in 2024, with new lines planned to connect remote regions to major urban centers high-speed rail expansion.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Organizing of the project is an important step towards planning of the project. Planning the project: Planning phase of the project management is done based on organization done in the previous step. While doing planning for the project, effective and clear estimate of the time and costs are done.

article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close All rights reserved.

America 203