Remove Airports Remove Roads Remove Travel
article thumbnail

4 key innovations and construction trends across airport design

BD+C

4 key innovations and construction trends across airport design 0 qpurcell Mon, 12/04/2023 - 10:04 Airports Here are some of the key trends Skanska is seeing in the aviation sector, from congestion solutions to sustainability. More than 40,000 airports worldwide facilitate the annual global travel of billions of passengers.

Airports 105
article thumbnail

Where is Most Construction Happening in the China: 2024 Overview

Building Radar

This network aims to reduce travel times, boost tourism, and facilitate regional economic development economic impact of high-speed rail. These expansions are crucial for supporting China’s growing air travel industry and improving connectivity between urban and rural areas expanding airport connectivity.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Biggest Infrastructure Project in Australia for 2024

Building Radar

This ambitious $20 billion project aims to connect Greater Parramatta to the Sydney CBD, significantly reducing travel times and easing congestion Sydney Metro developments. This 1,700-kilometer rail corridor will streamline the movement of goods, reduce road congestion, and support regional economies freight rail improvements.

article thumbnail

The next destination: Passive design airports

BD+C

The next destination: Passive design airports 0 qpurcell Thu, 04/18/2024 - 13:59 Airports Today, we can design airports that are climate resilient, durable, long-lasting, and healthy for occupants—we can design airports using Passive House standards. On the path to passive The airport itself is becoming more sustainable.

article thumbnail

BALANCED CANTILEVER METHOD OF BRIDGE CONSTRUCTION

The Constructor

The complete pier segment is then used as an erection platform and launching base for all subsequent travelling formwork and concrete segment construction. Special formwork is positioned and cast-in-situ pier segment is begun. Cast-in-situ segments range between 3mm to 5m in length with formwork moving in tandem with each segment.

Concrete 214
article thumbnail

It’s another busman’s holiday for Digger in Fuerteventura

Digger Blog

Regular readers of the blog will recall that during recent visits to the island I have reported on the continuation of the roadworks from the airport at Puerto Del Rosario, down to Jandia in the south, which is where we normally stay.

Roads 91
article thumbnail

Bitumen Road Construction | Layers in a Bituminous Pavement | What Is Bituminous Macadam | Advantage Disadvantage of Bitumen Road

CivilJungle

Bitumen Road Construction. Bitumen road construction consists of different phases that are addressed, such as base course planning , bituminous coat application, bituminous mix placement, rolling and quality control, etc. Bituminous road has three layers. Disadvantage of Bitumen Road: Bituminous surfaces are less durable.

Roads 52