article thumbnail

I’m onto some rose-coloured BIM issues…and here is a tip for ArchiCAD users as a bonus

DebunkTheBIM

Still, that has not deterred me to consistently use the colour ‘red’ on my construction models as a warning sign, highlighting that an element is either under-defined or wrongly defined by the design consultants or others in charge of it.

article thumbnail

Nitpicking today – hinging of doors and arrows on stairs.

DebunkTheBIM

Go into any architectural consultancy employing people from different parts of the world and soon you’ll find two of them arguing about the way hinging of doors must be represented on drawings. Cadimage, the NZ Archicad-tool-developer is wisely catering for all tastes in their Doorbuilder. and indicate the opening of the door.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

DebunkTheBIM: If only?

DebunkTheBIM

Rebranding an architectural/engineering modelling program (ArchiCAD, Microstation, Revit or other) into one focused for the contractor-end of the AEC. As in, not just view, or re-purpose information provided by design consultants. It can’t really be that hard.

article thumbnail

Yeah But

Revit OpEd

In my travels working as a consultant I've been part of more than a few conversations debating using Revit or even the broader notion of BIM (Building Information Modelling). Consider that Archicad would love it if we all woke up tomorrow and gave them credit for doing it all years earlier. Any reply that starts with "Yeah, but."

Revit 76
article thumbnail

DebunkTheBIM: A bit more of a balance would be nice.

DebunkTheBIM

Pristine even, no evil promoters have managed to crack into the company’s MS Office or Outlook, nor GS’s Archicad/ Autodesk’s Revit. The weak link in AEC projects: consultants are lar. Thankfully my work environment is safe. Sometime, I wish they had. A bit more of a balance would be nice. Who needs BIM flowcharts?

article thumbnail

BIM Strategy- Why Everything, or Nothing Ever, Changes!

Building Information Management

The appropriate use of consultants, especially in the areas of “change management” Lack of understanding and adopting of newer and more efficient construction delivery methods (Integrated Project Delivery – IPD, Job Order Contracting – JOC), contracts, and supporting technology tools. Organizations also must.

BIM 74
article thumbnail

BIM Objects, Data, and Information – More than a 3D Pretty Picture – Soooo Much More!

Building Information Management

Following a period of industry consultation, Uniclass 2 is now being finalized for publication during 2013. The NBS National BIM Library contains a number of objects that connect at a ‘product’ level (e.g. hand driers, baths, individual doorsets) while others work at a ‘system’ level (e.g.

BIM 51