Remove Architecture Remove Document Remove Life Cycle
article thumbnail

Digital Twin – Aligning the physical and functional status of buildings and other physical objects with a corresponding digital model makes it possible to monitor and optimally manage capital reinvestment throughout their life-cycle.

Job Order Contracting

Aligning the physical and functional status of buildings and other physical objects with a corresponding digital model makes it possible to monitor and optimally manage capital reinvestment throughout their life-cycle. Requisite Components of a Physical Asset Life-cycle Management Solution. appeared first on 4BT.

article thumbnail

12 Step Program for Creating Credible Construction Estimates

Job Order Contracting

Monte Carlo simulation) to develop a confidence interval around the point estimate. ■ Monte Carlo simulation) to develop a confidence interval around the point estimate. ■ Monte Carlo simulation) to develop a confidence interval around the point estimate. ■

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEAN Construction Project Delivery and Facilities Operations, Maintenance, and Life-cycle Management

Job Order Contracting

Clearly defined and documented roles, responsibilities, workflows. Life-cycle Management. COBie is an information exchange specification for the life-cycle capture and delivery of information needed by facility managers. Standardized data architectures (Cobie, Masterformat, Uniformat, Omniclass).

article thumbnail

Construction Document Information Management

Job Order Contracting

Construction Document Information Management is central to productivity improvement. Construction Document Information Management. Streamlining Construction Document Information Management processes is an essential step towards improving productivity, quality, and overall value for all stakeholders. 2017, Cholakis, P.

article thumbnail

Construction is NOT complex…. People are. Successful Construction Project Delivery Requirements

Job Order Contracting

What documentation, forms are required? Who assesses the impact of the proposed changes? Who reviews the proposed change and its impact for initial approval ? How is the change implemented? What information is used in the process?

article thumbnail

Construction Classification Criticality – A Draft White Paper

Job Order Contracting

Architecture, Engineering, Construction, Facilities Management, & Life-cycle Management of the Built Environment. The combination of information related to all aspects of physical assets life-cycle is best called a physical asset model. Construction Classification Criticality.

Drafting 100
article thumbnail

Time to Restart, Reinvent BIM … BLM… Built-environment Life-cycle Managment?

Building Information Management

Equally important is a life-cycle view vs. first cost mentality. My focus is upon both the strategic aspects of life-cycle management and tactical implementation supported by technology and robust data architectures. . This provides true value for everyone and removes the disadvantages associated with low bid.