Remove Architecture Remove Fabrication Remove Railroad Remove Subcontracting
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

It remains the leading standardized data architecture for organizing line item construction cost data, construction specifications, and similar information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 33 29.05

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

It remains the leading standardized data architecture for organizing line item construction cost data, construction specifications, and similar information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 33 29.05

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). Railroad Spurs. Typically, tax-exempt IRBs have interest rates ranging from 70-85% of prime and are limited to $10 million per single issuance and $40 million total maximum per company. Sewer Lines, Sewage Treatment Facilities. Natural Gas-Line Services.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). 500 TAX CREDIT: Businesses may earn a $500 tax credit for adding new jobs in the production, assembly, fabrication, manufacturing or processing of natural resources. This credit is transferable and may be carried forward up to 14 years. SALES TAX INCENTIVES.

Income 75