Remove Architecture Remove Feasibility Remove Philadelphia
article thumbnail

When office-to-residential conversion works

BD+C

The Older, the Better Cities such as DC, Philadelphia, and New York also have a significant share of older, prewar office buildings that were constructed before modern HVAC systems allowed acres of interior space that’s artificially lit and mechanically ventilated. Such spaces could generate more revenue than basic storage rooms, he says.

article thumbnail

don't think: Do Revit: Autodesk Blogger Day: Revit Server

Do

My journal of work in Revit as part of a 600+ member architecture firm. There are some limitations since it is Version 1, but for the first time I can truly say we have feasible, solution sourced from Autodesk that allows our different offices to collaborate together on projects. Philadelphia Revit Users. dont think: Do Revit.

Revit 40
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Value engineering program is commonly carried out in the systematic stages of; feasibility, concept design, design development, construction and operations and occupancy phase of the projects (Table 1). Jointly organized by Kulliyyah of Architecture and Environmental Design and Kyoto University Japan. 12004 pp9-19 ISSN 0969-9988.