article thumbnail

How to Create an Independent Government Cost Estimate

Job Order Contracting

The IGCE consists of the anticipated costs to include direct costs (labor, products, equipment, travel, and transportation), indirect costs (burden on labor such as fringe benefits and labor overhead), material overhead, general and administrative (G&A) expenses, and profit. Contractor profit and overhead are NOT included. #4.

article thumbnail

Healthcare lighting innovation: Overhead fixture uses UV to kill airborne pathogens

BD+C

Architects Building Owner Contractors Designers Engineers Facility Managers Healthcare Buildings Hospitality Facilities Building Technology Hospital Design Trends Interior Architecture Lighting'

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Gateway of opportunity: Vertical-stacking doors in modern spaces

Construction Specifier

Compared to traditional sectional doors that use long ceiling tracks, hinges, or exposed cables for opening and closing, vertical stacking eliminates the need for unsightly, intrusive overhead hardware. Eliminating noisy overhead tracks and other mechanical parts also translates into quieter opening and closing.

article thumbnail

JOB ORDER CONTRACTING BASICS

Job Order Contracting

that reflects contractor overhead and profit, and other items as allowed via the contract. Any professional architectural or engineering services that required for a work order/task order are the responsibility of the awarded JOC contractor. The latter is a factor, generally around 1.2

Contract 147
article thumbnail

PSMJ Resources Blog: 11 Ways to Cut Overhead

PSMJ Resources

11 Ways to Cut Overhead. Here are eleven creative ideas to reduce your overhead expenses. Assign collateral duties to everybody in the office, virtually eliminating overhead positions. Architectural Record. 11 Ways to Cut Overhead. skip to main | skip to sidebar. Monday, July 23, 2012. Require all project-related.

article thumbnail

Taliesin West School of Architecture is Closing

Natural Building

Unfortunately, after 88 years, the Frank Lloyd Wright’s School of Architecture at Taliesin is closing because the Governing Board of the school was not able to reach an agreement with the Frank Lloyd Wright Foundation to keep it open. The post Taliesin West School of Architecture is Closing appeared first on Natural Building Blog.

article thumbnail

Color play: How to use hues and neutrals in architectural design

Construction Specifier

The widespread use of glass in architecture is possible because glass has been made stronger and more versatile with built-in performance features through the use of plastic interlayers. The post Color play: How to use hues and neutrals in architectural design appeared first on Construction Specifier. Color meets function.