Remove ASCC Remove Change Orders Remove Education
article thumbnail

Refine versus shine: Defining and defending design intent with refined concrete

Construction Specifier

From floors failing before substantial completion to skyrocketing change orders for never-ending densifier applications to the billions lost through delayed schedules, legal disputes, and contingency hemorrhaging, enough is enough. The industry urgently needs a specification framework that is measurable, verifiable, and defensible.

Concrete 105
article thumbnail

Concrete floors in diverse facilities: Key factors for optimal performance

Construction Specifier

This work generally results in change orders to grind or fill (lower and raise) elevations to an acceptable and uniform plane that meets the flooring specification requirements. Assigning the “fault” is difficult and unforeseen costs and scope durations escalate as a result.