Remove ASCC Remove Change Orders Remove Inspections
article thumbnail

Concrete floors in diverse facilities: Key factors for optimal performance

Construction Specifier

The adoption of the standardization of FF/FL testing in Division 03 allows for uniform testing of concrete slabs during the threshold inspection, delivering results to the architecture and engineering team, showing compliance to or failure in meeting design specification requirements.