Remove Bidding Remove Renovating Remove Risk
article thumbnail

Optimizing Construction, Repair, Renovation, and New Build Outcomes

Job Order Contracting

Optimizing Construction, Repair, Renovation, and New Build Outcomes requires a robust programmatic process that is consistently applied and continuously improved. Let’s start with what methods will NOT WORK if used on their own… Design-bid-build. CM@R/CM@Risk. Last Planner / Last Planner System. Design-build.

article thumbnail

Underperforming Public Sector Facilities Renovation Repair and New Builds – Time for Change

Job Order Contracting

Underperforming Public Sector Facilities Renovation Repair and New Builds – Time for Change. Whether a Federal, State, County, or Local Government, most public sector organizations underperform when it comes to planning, procuring, and executing facilities repair, renovation, or new builds. Introduction. Leverage technology.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Improving Construction Project Outcomes

Job Order Contracting

Efficient repair, renovation, maintenance, and new construction of buildings, transportation systems, utilities, and bridges can become a reality with appropriate leadership focus. From a historical perspective, traditional methods such as design-bid-build and others have failed. Time, Cost, and Risk Management. Email *.

article thumbnail

Granular Local Market Cost Data is Essential for Construction Cost Visibility & Management

Job Order Contracting

Granular Local Market Cost Data is Essential for Cost Visibility & Management (Repair, Renovation, Maintenance, & New Builds) Using current, verifiable, and detailed local cost dat a instead of national averages with adjustment factors ensures: Cost transparency All labor, material, and equipment costs are broken down and verifiable.

article thumbnail

CM-At Risk at Towson University: $13.5 million project

Constructonomics

I attended a pre-bid conference on Thursday November 19, 2009 at Towson University for a CM-at risk project for the r emodel of two residence halls on campus. Bid package preparation. All projects must be renovations. Two projects must be exterior renovations of buildings with historical significance.

Risk 122
article thumbnail

MasterFormat Construction Cost Estimating

Job Order Contracting

Uniformat level and/or assembly level, or building level cost data is useful for budgeting purposes only, and should not be used for bidding, procurement, and execution actual projects with builders, construction managers, etc. MasterFormat Construction Cost Estimating drives cost visibility, transparency, and best value outcomes.

article thumbnail

Rethinking Job Order Contracts

Job Order Contracting

Rethinking Job Order Contracts to drive best value facilities repair, renovation, maintenance, and new build outcomes. Job order contracting is a project delivery method that was developed to expedite the numerous repair, renovation, maintenance, and “minor” new construction projects facing real property portfolios owners.

Contract 258