Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB).

article thumbnail

JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Adversarial, change-order-oriented environment is common between owner, A/E, and contractor. Project cannot be expedited with a collaborative fast-track process; drawings and specs must be 100% complete to bid (though latter rarely occurs). Design changes can result in costly impacts to drawings or construction work in progress.

Design 130
article thumbnail

Job Order Contracting Basic Definitions

Job Order Contracting

There should be sufficient detailed to enable the JOC Contractor to develop a detailed line item JOC Proposal and/or estimate for a JOC Project/Job Order. SOW documentation may include a narrative description of the Work, drawings, and/or partial or full design documents depending on the complexity of the individual Job Order.

Contract 100
article thumbnail

How technology can help you maintain your profit margins at residential projects

Lets Build

This information consists of everything needed to eliminate project uncertainties, including accurate models, drawings, and specifications. When you’re ready to get started, book your free demo of LetsBuild Coordination to gain the benefits of digital construction technology and start maintaining your profit margins at residential projects.

article thumbnail

3 ways to avoid defects in construction

Lets Build

Defects due to omission are typically fixed through change orders that add to the scope of work for one or more contractors. Plus, builders might end up working with old versions of construction drawings without the design team’s latest changes. These defects can occur through omission or error. Workmanship defects.

article thumbnail

QA and QC in Construction

Fieldwire

The Request for Information, or RFI, process on most construction projects is the ongoing, often a daily routine of asking a question and getting an answer about something on the construction drawings. Read more → Paper drawings in the field are completely replaced by digital drawings. It is an important process. Watch Course