Remove Books Remove Legal Remove Negotiation Remove Profitability
article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

“Coefficient” – a numerical factor that represents costs (generally indirect costs) not considered to be included in the “Unit Price Book” (UPB) unit prices (e.g., d) An indefinite-delivery, indefinite-quantity (task order) contract which provides for the use of negotiated, definitive, bilateral orders (i.e.,

Contract 100
article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

“Coefficient” means a numerical factor that represents costs (generally indirect costs) not considered to be included in “Unit Price Book” unit prices (e.g., Coefficients proposed by offerors are multiplied times the unit prices in the Unit Price Book to price a job or project on individual orders.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting Operations Manual

Job Order Contracting

The owner estimate or detailed analysis must be completed before receipt of the Contractor’s proposal and before negotiations take place. The owner estimate will be used to evaluate the reasonableness of the Contractor’s proposal and will serve as the owner’s pricing and quantity objective during negotiations.

Contract 100
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. The UPB costs should NOT include contractor overhead and profit. JOB ORDER CONTRACT (JOC) EXECUTION GUIDE. x 1.01 = $15.15).

Contract 100
article thumbnail

Job Order Contract Program Implementation

Job Order Contracting

For example, work in several locations and/or associated varied building types may require the use of various location factors or even separate unit price books. There also be a need to structure indirect costs and profit for NPP work. THE UNIT PRICE BOOK. Technical, purchasing, and legal personnel attend the conference.

Contract 100
article thumbnail

Job Order Contracting – JOC – DOD – AFARS

Building Information Management

“Coefficient” means a numerical factor that represents costs (generally indirect costs) not considered to be included in “Unit Price Book” unit prices (e.g., Coefficients proposed by offerors are multiplied times the unit prices in the Unit Price Book to price a job or project on individual orders. 5117.9004-2 Solicitation.

article thumbnail

Every Owner Should Implement JOC – JOB ORDER CONTRACTING – for Renovation, Repair, Sustainabilty, and Maintenance Construction Projects

Building Information Management

Job Order Contracting is a construction delivery method and a long-term IDIQ contract for construction services delivered on an on-call basis through firm, fixed price delivery orders based on pre-established unit prices (via a unit price book, UPB). Items that are not in the UPB can be negotiated, priced, and added to the UPB at any time.