Remove Budget Remove Engineering Remove Life Cycle
article thumbnail

Improving the PROCURMENT MODEL for Facilities Repair, Renovation, Maintenance and Construction

Job Order Contracting

Real property owners, architects, engineers, builders, and other stakeholders have long realized the construction industry and the life-cycle management of built environment have proven wasteful. Poor leadership across the public sector with respect to facilities/built environment asset life-cycle management.

article thumbnail

LEAN Asset Life-cycle Management – Achieve Optimal Construction Outcomes

Job Order Contracting

Optimal construction outcomes such as 90%+ of project on-time and on-budget and 96% satisfaction levels are achieved daily, however, by less than 5% of all real property owners, contractors, architects and engineers. of all construction projects are actually delivered on-time and on budget. The net result is 2.5%

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

Consistent delivery of quality repair, renovation, maintenance, and new build projects on time and on budget is possible using an integrated planning, procurement, and project delivery solution. Budget and Schedule. Engineering, Construction and Architectural Management, 26(1), 104–. Management in Engineering, 35(1), 05018014.

article thumbnail

Best Value Facilities Repair, Renovation Work Order Delivery

Job Order Contracting

An integrated planning, procurement, and project delivery solution that drives consistent on-time, on-budget, quality outcomes at a fair price. All parties can visualize project and work order requirements at a granular level and drive efficient life-cycle management. Collaborative design for constructibility.

article thumbnail

Adopting a Program versus a Project Approach Improves Facilities Management and Construction Outcomes.

Job Order Contracting

Volumes have been written about the fragmentation of the AECOO (architecture, engineering, construction, operator, owner) and Facilities Management sectors and their relative high levels of economic and environmental waste. Aligning strategies and objectives with processes and workflows.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

Collaborative Construction Performance, Enablers, & Requirements

Job Order Contracting

While there is ample evidence that LEAN construction planing, procurement, and project delivery can drive the consistent execution of repair, renovation, maintenance, sustainability, and new construction projects on-time and on budget, there have been relatively few early adopters. Ready to learn more?