Remove CA Remove Insurance Remove Sewer
article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

AIA: American Institute of Architects, American Insurance Association. CA: Compressed Air. CISP: Cast Iron Soil/sewer Pipe. ADJ: Adjust, Adjustable, Adjacent. AF: Above the Floor. AFF: Above Finished Floor. AGA: American Gas Association. AGG: Aggregate. AGGR: Aggregate. AIC: Amperes Interrupting Circuit. AL: Aluminum.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. ETP job training funds are available to all CA manufacturing companies, companies that face out-of-state competition and businesses that are expanding or relocating to California from other states or countries.

Income 75
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

AIA: American Institute of Architects, American Insurance Association. CA: Compressed Air. CISP: Cast Iron Soil/sewer Pipe. ADJ: Adjust, Adjustable, Adjacent. AF: Above the Floor. AFF: Above Finished Floor. AGA: American Gas Association. AGG: Aggregate. AGGR: Aggregate. AIC: Amperes Interrupting Circuit. AL: Aluminum.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

AIA: American Institute of Architects, American Insurance Association. CA: Compressed Air. CISP: Cast Iron Soil/sewer Pipe. ADJ: Adjust, Adjustable, Adjacent. AF: Above the Floor. AFF: Above Finished Floor. AGA: American Gas Association. AGG: Aggregate. AGGR: Aggregate. AIC: Amperes Interrupting Circuit. AL: Aluminum.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Manhole, Sewer. Application: This standard applies to manholes which contain sanitary sewer lines or other related piping systems. Examine structural features of sewer line, interior of manhole, manhole frame and cover, etc. Check operation of safety switches to insure they have not been by-passed. Respirator 3.