Remove Certification Remove Change Orders Remove Drawings
article thumbnail

Refine versus shine: Defining and defending design intent with refined concrete

Construction Specifier

From floors failing before substantial completion to skyrocketing change orders for never-ending densifier applications to the billions lost through delayed schedules, legal disputes, and contingency hemorrhaging, enough is enough. Abrams is passionate about bridging the gap between drawing and specification intent design intent.

Concrete 105
article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

Change orders : A change order is a written agreement between the owner or architect and the contractor that changes the contract amount, work requirements, and/or schedule. Each payment application builds on the one before it, so it’s important to be accurate, and double-check your figures before submitting.

Lien 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Complete Guide to Project Commissioning

Autodesk Construction Cloud

According to Whole Building Design Guide, “Buildings that are properly commissioned typically have fewer change orders , tend to be more energy-efficient, and have lower operation and maintenance cost.” Much like shipbuilding, the process involves a series of documenting, scheduling, and testing processes.

article thumbnail

Construction Forms for excel

Construction Cost Estimating

Office Forms for Construction : Transmittal, Submittal Log, Minutes of Meeting, FAX Cover, FAX Log, Memo, Memo - Log, Phone Log, Phone Conversation Record, Insurance Verification Log, Petty Cash, Project Payment Summary, RFI - Request for Info, RFI Request for Info Log, Financial Statement, Bar Schedule, Insurance Specifications, Request for Substitution, (..)

Lien 45
article thumbnail

The Ultimate Construction Glossary for 2024: Essential Terms and Definitions

Building Radar

In this article, we will explore key terms such as sustainable construction, turnkey projects, and as-built drawings, with helpful links that provide in-depth insights. What are ‘As-Built Drawings’? As-built drawings are indispensable for facility management, maintenance, and any subsequent renovations.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

These negotiations must precede the JO award/approval and are not allowed on a Change Order basis. This action will require a modification to the JO to reflect a change order credit. It is the sole responsibility of ORGANIZATION NAME to authorize a Change Order to a JO. of Change Order is required.

Contract 100
article thumbnail

Job Order Contracting Basic Definitions

Job Order Contracting

The one-year period, beginning with the date of Job Order Contract award, during which the Owner may issue and/or implement Job Orders to the Contractor. CERTIFICATE FOR PAYMENT. JOB ORDER / JOC PROJECT SCHEDULE. The term “Job Order Work” means the Work of one or more Job Orders as may be modified.

Contract 100