Remove Certification Remove DC Remove Visualization
article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

The benefits include centralized and visual communication, early exploration of options, sustainability, efficient design, integration of disciplines, site control, as built documentation, etc.–effectively IFC Certification Procedure (IFC 4×4**). In 2010 buildingSMART developed the new IFC Certification 2.0

BIM 40
article thumbnail

Workforce Training: Engineering A Skilled Workforce

Buisness Facilities Contributed Content

In March 2016, McAuliffe signed into law measures that establish a workforce training program targeted to increase specific industry certifications and occupational licenses that meet the needs of businesses in each region of the state. million for a veterans’ portal to strengthen outreach to this key population.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Visually inspect for corrosion. Make a visual inspection of the flue and chimney, checking for obstructions. Visually inspect equipment to ensure structural integrity, check all mechanical connections and fasteners for tightness. Visually inspect equipment for body shearing or pinch points. Check bolt torque.

article thumbnail

2021 Pro Builder Top 100 Products

Pro Builder

In addition, the veneer exceeds certification standards for compressive strength. Builders also can earn green-building certification credits. . Features include 2D design, elevations, cross-sections, 3D design, 3D visualization, and construction drawing tools. Click for more info. . . Motorized screens / Phantom Screens.

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

LEED Certification, and LEED in general has been a GREAT marketing tool. Washington, DC 20417. Green Building Certification Institute. Visual Cue Thermal Imaging. Wiencek + Associates Architects + Planners, DC LLP. That said, should LEED be a requirement? Is LEED cost effective? Should LEED be modified? Cumby, Inc.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Steve received his Certificate of Management – Building Information Modeling from the AGC in 2011. He also served in the agency’s facility management offices as the national energy manager and as facility manager for the agency’s Washington DC headquarters. Ceton lives in the suburbs of Washington, DC. . Leigh Lally. .

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Steve received his Certificate of Management – Building Information Modeling from the AGC in 2011. He also served in the agency’s facility management offices as the national energy manager and as facility manager for the agency’s Washington DC headquarters. Ceton lives in the suburbs of Washington, DC. . Leigh Lally. .

BIM 40