Remove Certification Remove Documentation Remove Structural Engineering
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Following are the list of document project required before applying for permission.

article thumbnail

How To Reduce Risk On Construction Projects

ProcurementExpress.com

The structural engineer who designed the building was asked if the dishes could be put on this roof/floor area. The the structural engineer, was performing a site survey and the question arose about where to move the dishes. . The actual roof deck was a floor deck including the concrete slab. .

Risk 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How To Reduce Risk On Construction Projects

ProcurementExpress.com

The structural engineer who designed the building was asked if the dishes could be put on this roof/floor area. The the structural engineer, was performing a site survey and the question arose about where to move the dishes. . The actual roof deck was a floor deck including the concrete slab. .

Risk 40
article thumbnail

2020 Pro Builder Top 100 Products

Pro Builder

Nudura’s insulated concrete form (ICF) series creates a complete building envelope with one product that integrates the form system, wall structure, insulation, air barrier, vapor-control barrier, and interior and exterior fixing points. Roof and Wall System / Huber Engineered Woods. Air and Water Barrier / Georgia-Pacific Gypsum.

Products 116
article thumbnail

Autodesk Construction Champions 2023: 25 People Powering the Future of Construction 

Autodesk Construction Cloud

As we know, construction teams go through a lot of paper—much of that is used to print drawings, mark up documents, and the like. By integrating VDC with the safety department, Emmanuel was able to coordinate online OSHA trainings and guide the VDC department to receive OSHA 10 hour certifications.

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

LEED Certification, and LEED in general has been a GREAT marketing tool. Green Building Certification Institute. JAG Engineering Services Inc. JDM/Structural Engineering, PSC. JMPE Electrical Engineering. Sustainable Documentation LLC. The Green Engineer, LLP. Is LEED cost effective?

article thumbnail

Fenestration and glazing: Seismic performance specification considerations

Construction Specifier

This includes updated criteria for the most widely used standard: the American Society of Civil Engineers/Structural Engineering Institute’s ASCE/SEI 7-22, Minimum Design Loads and Associated Criteria for Buildings and Other Structures. She serves as the internal auditor for FGIA fenestration certification programs.

Safety 52