Remove Certification Remove Electrical Remove Leases
article thumbnail

A/E/C Marketing Best Practices Webcast

Construction Marketing

Prior to CWA Deborah served in marketing roles with Bovis Lend Lease, OWP/P (Cannon Design), Nova Environmental Services and more. In addition, Wendy is trained in lean manufacturing, achieving Six Sigma Green Belt certification. She holds both an MBA in Marketing and a Bachelor of Science in Marketing from Auburn University.

article thumbnail

Your ENERGY STAR Score is About to Fall Precipitously

Green Building Law Update

The change is significant for buildings pursuing LEED or Green Globes certification, for buildings with GSA or other government space leases tied to an ENERGY STAR score of 75, for buildings in cities with mandatory benchmarking, and for the more than 450,000 commercial properties that have an ENERGY STAR score.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Path to Net Zero: A Guide to Carbon Offsets

Stok

Using certificates that represent a reduction of one metric ton of carbon dioxide emissions, people and organizations can purchase offsets that help fund projects that actively offset greenhouse gas emissions. stok has worked with 3Degrees and Schneider Electric in the past, but the right vendor depends on your specific project goals.

Green 79
article thumbnail

Feature Story: Shovel-Ready Sites – Fired Up, Ready To Go

Buisness Facilities Contributed Content

states have launched site certification programs with the goal of helping communities prepare available sites for investment and expansion. The latest designation happened in April, when the Fairhope Airport Industrial Park in Baldwin County received the AdvantageSite certification. Across the U.S., million in capital investments.

Site 66
article thumbnail

M&V, MBCx, WTF: Building Performance Monitoring as a Means to Achieve Decarbonization Goals

Stok

M&V tells you how much energy is used and can be grouped together by load type and energy end-uses including HVAC, plug loads, lighting, electric vehicle charging (EVs), photovoltaics (PV), elevators, and any large equipment like chillers, air handling units, boilers, and pumps.

article thumbnail

AEE WEST 2023: Building Performance Monitoring

Stok

M&V tells you how much energy is used and can be grouped together by load type and energy end-uses including HVAC, plug loads, lighting, electric vehicle charging (EVs), photovoltaics (PV), elevators, and any large equipment like chillers, air handling units, boilers, and pumps.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.