Adopting a Program versus a Project Approach Improves Facilities Management and Construction Outcomes.

Job Order Contracting

Program and outcome based coordination and collaboration between owners, design professionals, prime contractors, subcontractors, and suppliers involved during the life-cycle aspects of the project is accomplished via ongoing training, client specific workflows, and supporting Information environments accessible to all.

article thumbnail

JOC Contractor Evaluation

Job Order Contracting

JOC contractor evaluation is an ongoing process, begining with their response to a Job Order Contract Request for Propsals for design-builders and continuing throughout the life-cycle of the JOC Program. Projects are complete in a quality manner, per specfications, on time and on budget, without change orders.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

LEAN JOC – Job Order Contracting

Job Order Contracting

The approach invests more resources earlier in the Project life-cycle. Work scope is developed and communicated is more detail and more effectively, resulting in the avoidance of traditionally prevalent delays, change orders, and associated skyrocketing costs. Asset Life-cycle Total-cost-of-ownership (TCO) Management www.4BT.us.

Contract 162
article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Even though the majority of costs (approximately 80% of total life-cycle costs) occur during the operational and maintenance (O&M) phase, decision-making is largely made based upon lowest bidder versus best value as well as current year impacts versus multi-year considerations. Job Order Contracting. The Obstacles.

article thumbnail

Overcoming Common Facilities Management Challenges – 2019 and Beyond!

Job Order Contracting

Traditional project delivery methods include, but are not limited to the following: construction management at risk (CMR), design-build (DB), and design-bid-build (DBB). Project Delivery Method. It is the project delivery system that ultimately impacts eventual success or failure more than any other single element. Unit Price Book.

article thumbnail

The Life-cycle of a Job Order Contract

Building Information Management

Job Order Contract Life-cycle. At the Pre-Proposal Meeting, the PM should set up a date for the pre-construction “site visit” A designated form with an appropriate amount of information requesting JOC work is completed and forwarded to the “Contract Specialist” Proposal Request.