Remove Change Orders Remove Document Remove Drawings Remove Mobility
article thumbnail

JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). Any required documentation and/or forms.

article thumbnail

The Construction Office Imperative: Digitize, Go Paperless and Mobile

Carol Hagen

Construction companies are bombarded by documents daily and making those documents electronic will reduce paper right? If your construction accounting system doesn’t have at minimum a drag n drop feature for documents and emails, it’s time to look for an integrated, comprehensive replacement solution. Not so fast.

Mobility 204
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

More than a Dozen New Autodesk Build Releases You Should Know in July

Autodesk Construction Cloud

This month, we’re excited to release feature additions and enhancements to Autodesk Build across document management, project management, cost management, and quality and safety. Sheets | Full Content Search Improvements – Previously in May, we enabled content search within a drawing for new projects.

article thumbnail

The Complete Guide to Project Commissioning

Autodesk Construction Cloud

Much like shipbuilding, the process involves a series of documenting, scheduling, and testing processes. According to Whole Building Design Guide, “Buildings that are properly commissioned typically have fewer change orders , tend to be more energy-efficient, and have lower operation and maintenance cost.”

article thumbnail

The Latest from Autodesk Build: 28 Product Updates 

Autodesk Construction Cloud

Document Management . Cost Management | Flexible Change Order Display Option within Cost Payment Application Tab* . Meeting Minutes | Mobile Enhancements . Members on mobile now see two improved workflows, Location tab and QR scanner, for accessing data on Locations. . Document Management Releases .

Autodesk 105
article thumbnail

How The Cloud Is Enabling Smarter Project Management—Part 4 of 5

Viewpoint Construction Technology

Some software providers claim their products work in the cloud, but those services might not be designed to take advantages of browser interfaces and mobile access. Or as one contractor recently put it, “I reviewed draw requests from 35,000 feet in the air on WiFi on a flight to China over Siberia.” Why is that important?

article thumbnail

What’s New with Autodesk Construction Cloud? 35+ Releases You Should Know  

Autodesk Construction Cloud

When creating or updating an issue from the Issues log, web and mobile users can now place that issue on an existing model, sheet, or file – or – remove its placement. Cost Management | Flexible Change Order Display Option within Cost Payment Application Tab * . Learn more about BCF Export in our blog! .

Autodesk 105