The Construction Office Imperative: Digitize, Go Paperless and Mobile

Carol Hagen

Construction companies are bombarded by documents daily and making those documents electronic will reduce paper right? If your construction accounting system doesn’t have at minimum a drag n drop feature for documents and emails, it’s time to look for an integrated, comprehensive replacement solution. Not so fast.

Mobility 204
article thumbnail

Commercial Construction Project Planning: 3 Warning Signs Your Budget Might Go Bust

HardHatChat

Clients may have not given their architect or engineer enough time to create a detailed set of documents; skimped on drawings assuming details will be decided along the way; or decided to skip an existing conditions survey altogether to save the cost. There’s a misperception in this industry that general contractors love change orders.

Budgeting 337
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Preparing Independent Government Estimates – IGEs , IGCEs

Job Order Contracting

Most Independent Government Cost Estimates are Not Well Documented. The usefulness of an IGE to a contracting officer and other Government interest depends largely upon its supporting documentation. Unfortunately, the process is largely done inappropriately and without cost transparency or visibility, and rarely is verifiable.

article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Using these granular elements and sharing the associated descriptions, l abor, material, and equipement details in a standardized format (CSI MasterFormat) with all project participants within a robust collaborative process is the path to significant cost savings and the mitigation of change orders, disputes, and waste.

Travel 241
article thumbnail

Why It’s Time for Contractors to Adopt Collaborative BIM

Viewpoint Construction Technology

Better logistics and staging —The extended team can easily see where materials and equipment will be staged, increasing oversight and efficiency during project execution. Accessible, version-controlled documents —BIM software solutions simplify data management and expand accessibility of documents to the entire team.

BIM 223
article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

The errors and poor processes result in change orders, project delays, and legal disputes. 10% are due to equipment and/or materials delays, most off which could have been foreseen. 10% are due to site related productivity issues, most of which could have been foreseen. are all defined.