Remove Change Orders Remove Documentation Remove Inspections
article thumbnail

JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). Any required documentation and/or forms.

article thumbnail

Collaborative LEAN Construction Software

Job Order Contracting

The innovate and exclusive Collaborative LEAN Construction Software for the Enterprise or Single Organization offering all of these features. The innovate and exclusive Collaborative LEAN Construction Software for the Enterprise or Single Organization offering all of these features.

Software 189
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How Much is Poor Construction Document Management Costing You? 

Autodesk Construction Cloud

As teams get larger and construction projects become more complex, proper document management needs to be an integral part of your workflow. Poor document management is detrimental to a project and can lead to delays, budget overruns , and rework. trillion in 2020. billion in rework alone annually.

article thumbnail

3 ways to avoid defects in construction

Lets Build

Design defects are a result of the design team failing to produce organised and accurate construction documents. Defects due to omission are typically fixed through change orders that add to the scope of work for one or more contractors. Inefficient document distribution. Store your documents in one place.

article thumbnail

Data Analytics Trends in Construction

Viewpoint Construction Technology

Injuries, safety inspections and other information must be recorded and in some cases submitted to the Occupational Safety and Health Administration. Closely tracking things like job costs, change orders, material and equipment usage and worker productivity from your projects can help better forecast future work and lead to smarter bidding.

article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

The errors and poor processes result in change orders, project delays, and legal disputes. In order to achieve cost visibility and transparency appropriate local unit costs for labor, labor productivity, materials, and equipment are required.

Schedule 232
article thumbnail

JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB).