Remove Change Orders Remove Environment Remove Safety
article thumbnail

Facilities Management Key Performance Indicators

Job Order Contracting

Facilities Management Key Performance Indicators(KPIs) provide objective analysis of select aspects of the built environment. The following terms, definitions and KPI’s are relevant to life-cycle management of the built environment and may be useful to your organization. Number/percentage of change orders.

article thumbnail

Collaboration in Construction – From “ad-hoc” to “best process”.

Job Order Contracting

Many commercial real property owners and facilities managers will require building competencies in all aspects of built environment life-cycle management. Over the past few years real property owners are being pressured more than ever to transition sustainable economic and environmental facilities management policies and programs.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

Construction Safety. » Keep Work Environment Safe for Lower Job Costs. David is a construction safety expert for Carolina Safety Consultants with over 20 years of experience. Some project managers tend to think of safety in the workplace as one of those things that we do “when we get a chance.” MANAGEMENT |.

article thumbnail

An Introduction to the Different Types of Construction Drawings

Autodesk Construction Cloud

As-built drawings are useful to building owners for maintenance, safety, repairs, and updates and renovations. As-built drawings are a set of drawings that represent the final exact construction of the building, including all materials, components, locations, dimensions, and other details of every element of the building.

article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage Risk 

Autodesk Construction Cloud

An example of a data point might be the number of overhead mechanical racks installed on the job that day, or logging the root cause of a safety incident. Or implementing new safety training to mitigate worker injury risk You can then use that knowledge to anticipate and better manage risk for future jobs.

Risk 52
article thumbnail

Building beyond boundaries: BIM and the data revolution in construction

Fieldwire

This not only hinders productivity but also increases the likelihood of errors, change orders, and delays during construction. There is also a need to overcome resistance to change within the industry. Additionally, attracting and retaining skilled labor is a pressing concern.

BIM 52
article thumbnail

The importance of keeping construction daily logs for every site activity

Lets Build

Your construction daily log shows why, how, and when changes occur and decisions are made; this enables everyone on-site to stay productive, maintain transparency, and, ultimately, reduce delays and unnecessary change orders.

Site 148