Remove Cleveland Remove Defense Remove Roads
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – State Rankings

Buisness Facilities Contributed Content

We wish we could tell you that most locations are mobilizing to fix the nation’s crumbling roads, bridges and dams; unfortunately, the opposite seems to be true: the United States received an overall grade of D+ in the American Society of Civil Engineers’ (ASCE) annual assessment, our starting point for BF’s evaluation.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

The riverfront complex is being built on the old Advocate newspaper site bordered by Main, North, Lafayette Street and River Road. Equally vital to the city’s strength as a logistics hub are its superior road and rail networks and its port on the Mississippi River. The approximately $30.5 million), as well as $12.7

Metro 110
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE FOCUS – Ohio: Slow And Steady

Buisness Facilities Contributed Content

Additionally, the Cleveland-Pittsburgh TechBelt Initiative—an initiative the Regional Chamber has taken a particular interest in as the physical center point of the TechBelt—served as the catalyst for the application team that won a $70 million Department of Defense-led National Research Center for Additive Manufacturing.

Ohio 63
article thumbnail

COVER STORY: 2012 Economic Development Deal of the Year Awards

Buisness Facilities Contributed Content

The Metro Atlanta plant will be Baxter’s third in the Southeast; it also has plants in North Cove, NC, and Cleveland, MS. Construction of the first manufacturing buildings at the new Baxter campus is expected to be completed in 2015, with full commercial production commencing in 2018. Bridgestone Americas $1.2-billion

Deals 85
article thumbnail

COVER STORY: Editors’ Location Picks

Buisness Facilities Contributed Content

Runway 9R-27L, located on the south side of the airport and running parallel to Griffin Road, is now being rehabilitated and lengthened. defense contracts. Louis and Cleveland. The huge $791 million South Runway Expansion Project should be completed and ready for landings and takeoffs in September 2014.

Omaha 76
article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

Billion Long Island Rail Road Expansion Project before finally landing with Hatch LTK in Boston. Nevermind the avoidance of costly rework down the road. in Montreal, and followed by a Site Foreman Trainee role at Colas, a road construction firm in France. Santa Paula, California.

article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

The 2008 announcement by then-owner Cerberus Capital Management that it would upgrade Jefferson North and expand its capacity by another 285,000 square feet almost immediately hit a huge bump in the road to recovery. Export Assistance Center in Cleveland, surging exports are a statewide trend in Ohio. According to the U.S.

Metro 111